Optimization of vertical alignment of highways utilizing discrete dynamic programming and weighted ground line

Articles > Article · 2009

Authors: A. Burak Göktepe, Selim ALTUN, Perviz AHMEDZADE

\n Volume: 33, Issue: 2\n 105-116\n \n, International, 2009, vol 33, pp 105-116

Summary

Earthwork optimization plays an important role for reducing the total cost of highway projects. Weighted Ground Line Method (WGLM) is an earthwork optimization technique based on a hypothetical ground line balancing cut-fill volumes and minimizing the total amount of earthwork. Current form of the method describes only a hypothetical reference line guiding project engineers to locate the optimal roadway for the fixed horizontal alignment. Therefore, there are numerous grade line alternatives available for a given Weighted Ground Line. The aim of this study is to present a method to integrate discrete dynamic programming with WGLM to achieve the best vertical alignment of highways in terms of earthwork optimization.

View details